RNOH – New & Refurbished Theatres
The provision of two new operating theatres and the refurbishment of two adjoining existing theatres.
Due to the tight programme requirements and logistical constraints of the site, the new theatres utilised two storey modular construction. The refurbishment of existing Theatres Numbers 1 and 2 was required to meet the requirements of the clinicians and the current HBN and HTMs.